West Valley School District Junior High Access Control

This project consists of adding access control to the main entry at West Valley Junior High. The intent of this project is to limit access to the building during predetermined hours and control traffic flow such that all access to the building is through the Main Office. This project reorganizes the vestibules at the main entry and modifies the main office layout. Approximately 1,100SF at the Junior High will be renovated.
  01 - General (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
G0.1 - Title Sheet 663.7 KB
  02 - Architectural (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
A1.1 - Enlarged Site Plans 644.9 KB
A2.1 - Junior High Floor Plan & Reflected Ceiling Plan 685.5 KB
A3.1 - Door & Room Finish Schedules 362.8 KB
A7.1 - Junior High Interior Elevations 298.5 KB
A8.1 - Details 761.4 KB
A8.2 - Details Casework 572.9 KB
D1.1 - Demolition Plans 301.2 KB
  03 - Mechanical (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
M0.01 - Mechanical Legend and Drawing Index 2.0 MB
M0.02 - Mechanical Abbreviations, General Notes and Schedules 3.7 MB
M2.01 - Junior High HVAC 1.7 MB
M9.01 - Mechanical Details 2.6 MB
  04 - Electrical (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
E0.01 - Electrical Legend and Drawing Index 1.8 MB
E0.02 - Electrical Abbreviations, General Notes and Schedules 3.8 MB
E2.01 - Junior High Lighting Plan 1.6 MB
E2.02 - Junior High Power Plan 1.5 MB
E2.03 - Junior High Systems Plan 1.7 MB