Wastewater Collections Facility Upgrade

This project is for the renovation of the existing, single story, 19,349 square foot Wastewater Collections Department Maintenance Facility in Yakima, Washington. The renovation area is approximately 7,161 square feet. The project will be constructed to meet the requirements of Type V-B construction, Occupancy Group B and S-2 per the International Building Codes, 2015 edition. The building is not sprinklered and is not equipped with a fire alarm system. No additional square footage is added in this project.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 72.7 KB
02 - Division 0 - Procurement and Contracting Requirements 3.4 MB
03 - Division 1 - General Requirements 327.1 KB
04 - Division 2 - Existing Conditions 23.6 KB
05 - Division 3 - Concrete 59.3 KB
06 - Division 4 - Masonry 30.7 KB
07 - Division 5 - Metal Fabrications 26.4 KB
08 - Division 6 - Wood, Plastics and Composites 71.5 KB
09 - Division 7 - Thermal and Moisture Protection 126.4 KB
10 - Division 8 - Openings 113.1 KB
11 - Division 9 - Finishes 114.9 KB
12 - Division 10 - Specialties 137.1 KB
13 - Division 11 - Equipment 20.9 KB
14 - Division 12 - Furnishings 40.1 KB
15 - Division 22 - Plumbing 373.0 KB
16 - Division 23 - HVAC 338.6 KB
17 - Division 32 - Exterior Improvements 15.9 KB