Public Jobs

Bids due in 6 days
7/20/20 10:00 am
Prosser Memorial Health - Nuclear Medicine TI
KDA Architecture
Prosser, WA
This project is an 674 sf T.I. to the lower level of the Prosser Memorial Hospital located at 723 Memorial Street in Prosser. The project includes a new Nuclear Medicine Procedure Room and all support space.
Bidding Closed
6/9/20 3:00 pm
West Valley Fire Station Expansion
KDA Architecture
Yakima, WA
An addition to the existing Fire Station and related site work as indicated.
Bidding Closed
5/21/20 11:00 am
YVFWC FY 2020 Facilities Upgrades
KDA Architecture
Yakima, Toppenish and Grandview, WA & Hermiston, OR
Reroofing, rooftop HVAC unit replacement, interior finish replacement, paving repair, stucco plastering, exit sign replacement, light fixture replacement, and other improvements.
Bidding Closed
4/30/20 2:00 pm
West Valley School District Junior High Access Control
KDA Architecture
Yakima, WA
This project consists of adding access control to the main entry at West Valley Junior High. The intent of this project is to limit access to the building during predetermined hours and control traffic flow such that all access to the building is through the Main Office. This project reorganizes the vestibules at the main entry and modifies the main office layout. Approximately 1,100SF at the Junior High will be renovated.
Bidding Closed
2/28/20 3:00 pm
Wastewater Collections Facility Upgrade
KDA Architecture
Yakima, WA
This project is for the renovation of the existing, single story, 19,349 square foot Wastewater Collections Department Maintenance Facility in Yakima, Washington. The renovation area is approximately 7,161 square feet. The project will be constructed to meet the requirements of Type V-B construction, Occupancy Group B and S-2 per the International Building Codes, 2015 edition. The building is not sprinklered and is not equipped with a fire alarm system. No additional square footage is added in this project.
Bidding Closed
7/10/19 2:00 pm
CHCW Ellensburg Medical Clinic TI
KDA Architecture
Ellensburg, WA
The project consists of interior remodeling as indicated in the Contract Documents.
Bidding Closed
6/6/19 4:00 pm
CVCH Sterile Processing Unit TI
KDA Architecture
Wenatchee, WA
The project consists of interior remodeling to accommodate the new sterile processing unit as indicated in the Contract Documents.
Bidding Closed
5/20/19 2:00 pm
KVH Family Medicine MAC TI
KDA Architecture
Ellensburg, WA
The Work of Project is defined by the Contract Documents and consists of the following: Tenant improvement / remodel as indicated in the Contract Documents.
Bidding Closed
2/25/19 3:30 pm
Prosser Memorial Health - Chardonnay Clinic TI
KDA Architecture
Prosser, Eastern WA
Interior remodel to create exam rooms, an x-ray room, support spaces, and other Work indicated in the Contract Documents.